No | Nama Peserta | K | B | A | T | P | PT | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. PUTRA ANDALAS BERSATU - 03.284.330.2-214.000 | Rp. 1.571.318.842,26 |
Rp. 1.571.318.842,26 |
||||||||
2 | CV. TEGAK 1 MANDIRI - 03.284.337.7-214.000 | Rp. 1.572.542.537,67 |
Rp. 1.572.542.537,67 |
||||||||
3 | CV. Anugrah Jaya - 01.663.735.7-214.000 | Rp. 1.652.428.510,68 |
Rp. 1.652.428.510,68 |
||||||||
4 | CV. MANTANG JAYA - 02.851.321.6-224.000 | Rp. 1.571.432.640,18 |
Rp. 1.571.432.640,18 |
Tidak menyampaikan Ahli K3 Konstruksi Bukti alat Crane dan Alat Pancang + Drop Hammer tidak atas nama pemberi sewa alat Tidak menyampaikan nama pekerja dan tanggal pekerjaan pada dokumen rkk pada point operasi keselamatan konstruksi | |||||||
5 | PT ALFIAN BUMI AGUNG - 85.223.049.9-024.000 | Rp. 1.669.570.373,58 |
Rp. 1.669.570.373,58 |
||||||||
6 | PT. BETHESDA PERSADA - 71.073.786.7-215.000 | Rp. 1.720.814.908,98 |
Rp. 1.720.814.908,98 |
||||||||
7 | CV.ENAMPILAR UTAMA - 74.907.562.8-214.000 | Rp. 1.569.126.576,03 |
Rp. 1.569.126.576,03 |
Tidak Memiliki pengalaman paling kurang 1 (satu) pekerjaan konstruksi dalam kurun waktu 4 (empat) tahun terakhir, baik di lingkungan pemerintah maupun swasta termasuk pengalaman subkontrak | |||||||
8 | CV. TELUK SEKAWAN - 81.222.886.4-223.000 | Rp. 1.462.965.194,22 di bawah 80% Nilai HPS |
Rp. 1.462.965.194,22 di bawah 80% Nilai HPS |
Pada table evaluasi keselamatan konstruksi jumlah bulan tidak sesuai dengan waktu pelaksanaan pekerjaan. | |||||||
9 | CV. INDOCO - 01.272.060.3-223.000 | Rp. 1.489.979.685,79 di bawah 80% Nilai HPS |
Rp. 1.489.979.685,79 di bawah 80% Nilai HPS |
Tabel IDENTIFIKASI BAHAYA, PENILAIAN RISIKO, PENGENDALIAN RISIKO K3 pada PENILAIAN SISA RESIKO tidak di isi. Pada table evaluasi keselamatan konstruksi jumlah bulan tidak sesuai dengan waktu pelaksanaan pekerjaan. Evaluasi pada isian identifikasi bahaya dinyatakan gugur karena identifikasi bahaya “tertusuk paku” tidak disampaikan peserta. Tidak menyampaikan nama pekerja dan tanggal pekerjaan pada dokumen rkk point D operasi keselamatan konstruksi | |||||||
10 | CV. INDRAGIRI PUTRA - 01.507.810.8-211.000 | Rp. 1.520.692.364,37 |
Rp. 1.520.692.364,37 |
Tidak menyampaikan nama pekerja dan tanggal pekerjaan pada dokumen rkk point D operasi keselamatan konstruksi Personil manajerial an. M.ZAINI YAHYA, ST jabatan Ahli K3 Konstruksi, pengalaman kurang dari yg disayaratkan yaitu 3 (tiga) tahun, pengalaman yg memenuhi syarat hanya 1 (satu) Tahun, yaitu Pembangunan Jembatan Sei Cenaku Desa Anak Talang Kec. Barang Cenaku Volume: 60 M2 | |||||||
11 | CV. UTAMA MAJU JAYA - 92.299.247.4-214.000 | Rp. 1.669.570.208,58 |
Rp. 1.669.570.208,58 |
||||||||
12 | cv.putra jaya gurindam - 86.964.740.4-214.000 | Rp. 1.664.224.728,06 |
Rp. 1.664.224.728,06 |
||||||||
13 | pt maharani grup mandiri - 84.646.843.7-024.000 | |
|
||||||||
14 | Trans Aselabar Abadi - 84.758.867.0-214.000 | |
|
||||||||
15 | CV. MARTA KARYA - 02.012.169.5-222.000 | |
|
||||||||
16 | AGUNG INDOTAMA PERSADA - 03.328.219.5-215.000 | |
|
||||||||
17 | CV. KEMBANG RAYA - 02.483.527.4-214.000 | |
|
||||||||
18 | cv. Sultan Ratuhapis - 76.318.625.1-214.000 | |
|
||||||||
19 | CV. MATA AIR - 01.853.000.6-214.000 | |
|
||||||||
20 | CV. BANGUN BINTAN JAYA - 01.768.844.1-214.000 | |
|
||||||||
21 | CV. SUKSES PUTRA RIAU - 01.853.050.1-224.000 | |
|
||||||||
22 | CV.Theresindo Sejahtera - 03.131.298.6-215.000 | |
|
||||||||
23 | budi putra indonesia (bupindo) cv - 01.200.758.9-214.000 | |
|
||||||||
24 | Jaya Citra Baru, CV - 01.852.998.2-224.000 | |
|
||||||||
25 | CV. CINDAI BERTUAH - 03.298.484.1-214.000 | |
|
||||||||
26 | HIZTEK - 03.144.148.8-009.000 | |
|
||||||||
27 | CV. COMBOL RAYA - 71.051.069.4-223.000 | |
|
||||||||
28 | CV ANUGERAH BANGUN KONSTRUCTION - 90.695.559.6-214.000 | |
|
||||||||
29 | CV. SKALA MULTI REKAYASA KONSULTAN - 02.157.358.9-214.000 | |
|
||||||||
30 | CV.RIZKY PUTRA MANORSA - 02.554.914.8-211.000 | |
|
||||||||
31 | CV. MUTIARA TRISTA - 75.702.730.5-216.000 | |
|
||||||||
32 | CV. FORTUNA BINTAN - 02.404.592.4-224.000 | |
|
||||||||
33 | CV. TANJAK GEMILANG - 91.389.379.8-214.000 | |
|
||||||||
34 | PT.Bintan Indo Permata - 75.688.247.8-214.000 | |
|
||||||||
35 | CV. CIVITECH BINTAN - 02.483.079.6-224.000 | |
|
||||||||
36 | CV. ALEXA PRATAMA MANDIRI - 03.284.328.6-214.000 | |
|
||||||||
37 | CV. ZALIKA BERSAUDARA - 31.679.358.7-222.000 | |
|
||||||||
38 | CV. MORA MANDIRI JAYA - 03.298.575.6-214.000 | |
|
||||||||
39 | CV. TEGAK ABADI - 70.880.833.2-214.000 | |
|
||||||||
40 | GALANG PUTRA PERDANA - 74.098.615.3-216.000 | |
|
||||||||
41 | CV. TASIK SERAI RACHMAT - 01.445.058.9-211.000 | |
|
||||||||
42 | CV. PULAU TENGGEL - 02.157.697.0-214.000 | |
|
||||||||
43 | CV. ANAK TAMIANG - 66.245.973.4-214.000 | |
|
||||||||
44 | PT. BANGUN SINAR PRATAMA - 03.246.427.3-214.000 | |
|
||||||||
45 | CV. RIZQY ANUGRAH - 03.284.479.7-214.000 | |
|
||||||||
46 | PT. RUFIYANDO HUMBANG PERSADA - 01.857.405.3-215.000 | |
|
||||||||
47 | CV. PUTRA CANE MANDIRI - 31.653.498.1-215.000 | |
|
||||||||
48 | Mitra Sinar Huban - 01.899.073.9-215.000 | |
|
||||||||
49 | NATHESA PANDAWA PERKASA - 83.517.301.4-225.000 | |
|
||||||||
50 | CV. MAJU BERSAMA CONSTRUCTION - 92.874.004.2-623.000 | |
|
||||||||
51 | CV. KARYA DWI MATRA - 02.404.225.1-214.000 | |
|
||||||||
52 | PT. RIDHA GEMILANG SUKSES - 93.870.061.4-214.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak