No | Nama Peserta | K | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | PT. GRAHA ADIGUNA KONSULTAN - 73.400.106.8-214.000 | 93,6 | Rp. 145.035.000,00 |
Rp. 145.035.000,00 |
||||||||
2 | PT. INTERDIMENSI KONSULTAN - 01.663.718.3-214.000 | 83,63 | Rp. 149.050.000,00 |
Rp. 149.050.000,00 |
||||||||
3 | CV. KENEN KONSULTAN - 02.157.637.6-214.000 | |
|
|||||||||
4 | CV. CINDAI BERTUAH - 03.298.484.1-214.000 | |
|
|||||||||
5 | PT. BATAM STRUCTURAL ENGINEERS - 02.723.801.3-215.000 | |
|
|||||||||
6 | CV.PASIFIC - 66.955.979.1-214.000 | |
|
|||||||||
7 | PT.MULTI SARANA KONSULTAN - 02.886.085.6-216.000 | |
|
|||||||||
8 | PT. Karya Harapan Architect - 01.852.987.5-214.000 | |
|
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak