No | Nama Peserta | K | SK | SB | B | A | T | ST | P | PT | HN | H | P | PK | Alasan |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
1 | CV. BUHARA PERSADA - 31.664.998.7-216.000 | 95,0 | 76,25 | 93,0 | Rp. 167.596.000,00 |
Rp. 167.596.000,00 |
Rp. 167.596.000,00 | ||||||||
2 | CV. KARYA ANUGRAH KONSULTAN - 02.221.490.2-216.000 | 95,0 | 95,0 | ||||||||||||
3 | PT. ABATA RENCANA KARYANUSA - 03.047.589.1-211.000 | 79,0 | 79,0 | ||||||||||||
4 | PT. SERA RORA ABADI KONSULTAN - 01.987.050.0-216.000 | 34,09 | 34,09 | ||||||||||||
5 | CV. Prima Kreasi Arsindo Consultant - 02.067.928.8-215.000 | 100,0 | 100,0 | ||||||||||||
6 | PT. ARMUDI PRADANA KONSULTAN CAB. BANDUNG - 73.114.447.3-423.001 | 75,0 | 75,0 | ||||||||||||
7 | PT. MATRASARAKAN SINERGITA - 70.283.126.4-429.000 | ||||||||||||||
8 | CV. LANG BUANA - 02.482.789.1-214.000 | ||||||||||||||
9 | SIMETRIS TEKNIK CONSULTANT - 03.298.588.9-214.000 | ||||||||||||||
10 | PT. Aura Jagat Mandiri - 31.644.843.0-009.000 | ||||||||||||||
11 | CV. PUTERE MELAYU CONSULTANT - 66.822.709.3-214.000 | ||||||||||||||
12 | cv.cakra naga lindu - 71.321.084.7-224.000 | ||||||||||||||
13 | PT. UTA ENGINEERING CONSULTANT - 01.465.713.4-428.000 | ||||||||||||||
14 | CV. ARTHA BANGUN Consultan - 02.421.565.9-201.000 | ||||||||||||||
15 | PT. WIDYA BUANA PRASETYA - 02.405.504.8-404.000 |
- A Evaluasi Administrasi
- T Evaluasi Teknis
- ST Skor Teknis
- P Penawaran
- PT Penawaran Terkoreksi
- HN Hasil Negosiasi
- SH Skor Harga
- SA Skor Akhir
- B Pembuktian Kualifikasi
- K Evaluasi Kualifikasi
- SK Skor Kualifikasi
- SB Skor Pembuktian
- H Evaluasi Harga/Biaya
- P Pemenang
- PK Pemenang Berkontrak